Projects
|
|
A recent project we have just completed is a New Grain
Plant in Cincinnati, Ohio. This project had a fast track construction schedule. Busy Bee was able to work hand in hand with the other disciplines and provide necessary services as required. |
|
A 400 foot bridge was erected from the land
based silo area out to the river loading tower. A large electrical equipment room is land based with a smaller electrical room at the barge tower. Busy Bee provided all power, lighting and control wiring on the project. |
|
Six new land based silos were constructed. New 150hp
& 125hp bucket elevators for receiving and shipping required large soft start controllers. Motor control equipment and switchgear was located in an electrical room near the base of the silos. Hazardous classified wiring methods were accomplished in required areas. |
|
|
|